| Railway Conservation, Maintenance and Treatment |
|
Infrastructure treatment plan, railway tracks and incidences, Iberian gauge tracks. Period 2009-2010. (Linares Maintenance Headquarters). Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €6,665,360 Sleeper replacement in the route between Villarrobledo–Minaya. Madrid – Alicante line. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €1,857,291 Railway track rehabilitation. Section: Cazalla-El Pedroso in the Mérida - Los Rosales line. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €1,375,157 Optimization of the railway section between Altea and Denia stations in the Alicante – Denia line. Client: Ferrocarriles de la Generalitat Valenciana (FGV) Budget: €926,871 Improvement of the hydraulic capacity and infrastructure in Los Siles station. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €679,545 Railway track rehabilitation. Section: El Pedroso-Villanueva del Río and Minas. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €424,643 Treatment and improvement of the Arjonilla-Villafranca section Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €311,074 Improvement and increase of the infrastructure hydraulic capacity and tamping. Section: Jimena de la Frontera-San Roque. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €298,837 Infrastructure treatment of the Villa del Río station. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €290,528 Maintenance tamping works in sections: León-Busdongo and León-Covas. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €249,000 Railway track equipment treatment in the stations around Port Bou. Client: ADIF (Spanish Administrator of Railway Infrastructures) Budget: €247,878
|







